Commercial – Betonbouw BV – General Contractor https://betonbouw.com The Go-To General Contractor of Curacao, Aruba Bonaire and St. Maarten for 45 years Thu, 28 Nov 2024 18:21:18 +0000 en-US hourly 1 Aqualectra – Trafohuisjes Nijlweg https://betonbouw.com/aqualectra-trafohuisjes-nijlweg/ Tue, 22 Oct 2024 20:22:23 +0000 https://betonbouw.com/?p=2056 The ‘Salu Power Plant’ will have a capacity of 40MW (Megawatts) on our grid, including two sophisticated 50 MVA (Mega Volt Ampere) transformers. 

]]>
Aqualectra – Trafohuisje Terra Cora https://betonbouw.com/aqualectra-trafohuisje-terra-cora/ Tue, 22 Oct 2024 20:21:15 +0000 https://betonbouw.com/?p=2054 The ‘Salu Power Plant’ will have a capacity of 40MW (Megawatts) on our grid, including two sophisticated 50 MVA (Mega Volt Ampere) transformers. 

]]>
Wärtsilä – Battery Energy Storage System https://betonbouw.com/wartsila-battery-energy-storage-system/ Tue, 22 Oct 2024 20:13:21 +0000 https://betonbouw.com/?p=2049

Technology group Wärtsilä will supply the Caribbean island of Curaҫao with a 25 MW / 25 MWh Battery Energy Storage System (BESS). The system will enable the expansion of renewable energy capacity and the reduction of carbon emissions, representing an important step towards a sustainable energy future for the island. The order was placed by Aqualectra, Curacao’s government owned utilities company

28 november 2024 : Construction site at Dokweg (former Hofi Mooi)

]]>
Wärtsilä – Salu Power Plant https://betonbouw.com/wartsila-salu-power-plant/ Tue, 22 Oct 2024 19:58:24 +0000 https://betonbouw.com/?p=2031

Technology group Wärtsilä has again been contracted by Aqualectra, Curaҫao’s government owned utilities company, to provide Engineering, Procurement and Construction in support of the country’s decarbonisation programme. This latest order is for a new 38.4 MW power plant that will be capable of providing efficient grid balancing as the level of renewable energy in the system continues to increase. The order was booked by Wärtsilä in Q3 2024.

The new Salu Power Plant is being supplied on a full engineering, procurement and construction (EPC) basis. Initially, the plant will provide baseload power but will be later utilised in a grid balancing role as part of the utility’s decarbonisation focus. It will operate with four Wärtsilä 20V32 engines and will immediately become one of Aqualectra’s most fuel-efficient power plants.

]]>
Marine Kazerne Suffisant Construction Work https://betonbouw.com/marine-kazerne-suffisant/ Fri, 06 Dec 2019 04:54:25 +0000 http://gedung.themesawesome.com/?p=52

Marine Kazerne Suffisant: Office Building and Garage Construction.

Op de Curaçaose Marinekazerne Suffisant worden opleidingen tot milicien gegeven. Daarnaast voert de kazerne het Sociaal Vormings Traject (SVT) op Curaçao uit en ondersteunt de kazerne eenheden bij nationale en internationale oefeningen.  De kazerne is ook gastheer van het Vrijwilligers Korps Curaçao (VKC). Deze vrijwilligers zijn inzetbaar voor de handhaving van de openbare orde op het eiland. 

 

 

 

]]>
Wärtsilä – Aqualectra Power Plant Dokweg https://betonbouw.com/wartsila-dokweg/ Tue, 06 Mar 2018 04:32:05 +0000 http://gedung.themesawesome.com/?p=41 The technology group Wärtsilä was awarded the contract to supply a 39 MW power plant to Aqualectra, the utility company of Curaçao.

The turnkey project provides much needed additional generating capacity and provide Aqualectra with the fast-starting capacity and flexibility needed to add more wind power capacity to the island’s system. The company already has more than 46 MW of installed generating capacity from wind energy and plans to add more renewable energy generation in the near future. The order with Wärtsilä was booked in October.

The Wärtsilä equipment is scheduled to be delivered in mid-2018, and the plant is expected to be fully operational in November of that year.

The new plant will operate on four Wärtsilä 34DF dual-fuel engines running initially on heavy fuel oil (HFO), but switching to liquefied natural gas (LNG) fuel at a later date. The Wärtsilä solution will add needed reliability to the grid, and when running on LNG will notably reduce the utility’s environmental impact. The plant will be equipped with continuous emissions monitoring capability.

“The reality is, we need more generating capacity to meet our growing demand for energy. And, given the focus we have put on increasing our renewable capacity, we are conscious of the fact that the output from wind power and solar are inevitably intermittent. Hence our requirement for a plant that can start quickly and ramp up to full output in a matter of minutes. The flexibility provided by the Wärtsilä engines will allow the necessary balancing, and is just what we need,” explained Mr. Darick Jonis, Acting Chief Executive Officer of Aqualectra.

“Aqualectra has been a customer of ours for more than 20 years, and they have two power plants from Wärtsilä already operating with a combined output of 96 MW. Naturally, we are honored to have again been selected to serve their needs with this Smart Power Generating unit,” commented Rodney George, Vice President, Caribbean, Wärtsilä Energy Solutions.

Antilliaans Dagblad – Nieuwe installatie Aquaelectra

]]>
VSBO SKAIH in Emmastad https://betonbouw.com/vsbo-skaih-in-emmastad/ Sun, 31 Jul 2016 16:23:14 +0000 https://betonbouw.com/?p=1204

S.K.A.I.H. Trahando firme pa progreso

Opdrachtgever : Gobiernu di Kòrsou

Het nieuwe Skol Avansá Integrá Humanista (Skaih) in Emmastad is in july 2016 opgeleverd. Op 1 januari 2017 is de school in gebruik genomen. De school biedt ruimte aan meer dan 400 leerlingen en biedt Ago en VSBO maar ook een HAVO/VWO-opleiding.
Het nieuwe gebouw is een grotere scholengemeenschap die op de humanistische leest is geschoeid, waarbij moedertaal Papiaments de instructietaal is. Ook voor de toekomstige havo- en vwo-leerlingen.
De school werd opgericht door Frank Martinus Arion vanuit de humanistische filosofie. Leren vanuit de eigen taal, in dit geval het Papiaments, is een belangrijk onderdeel hiervan. Het ontwerp is van architectenatelier Lobo & Raymann. De groundbreaking vond in februari 2016 plaats door Betonbouw.

Bron: Amigoe

]]>
Beach House Curacao Luxury Apartments https://betonbouw.com/beach-house-curacao/ Wed, 10 Dec 2014 16:49:35 +0000 https://betonbouw.com/?p=1232

The Beach House Curacao Luxury Apartment building

Client: Betonbouw

The Beach House Curacao apartment is centrally located and has a modern, Caribbean interior. It offers you the perfect ambiance for a relaxing holiday.
This beautiful and modern apartment resort consists of 24 luxury apartments and is situated in a unique location, directly on the coast of the crystal clear blue Caribbean Sea. One of the most beautiful beaches in Curaçao, “The Sea Aquarium Beach”.
The Sea Aquarium Beach has several beach shops, popular bars and restaurants with live music and within a few minutes you can walk to the Curacao Sea Aquarium where you can explore the beautiful underwater world of Curacao. and wireless internet.
The apartment has 2 bedrooms, a bathroom, living room and a fully equipped open kitchen with all possible amenities. The balcony offers a view of the beach and ocean where you can relax. wireless internet is also present at the apartment.

]]>